A full office renovation for a major European metals and extrusion company. Custom interior partitions and ceiling systems spanning multiple floors, built from PET felt on aluminium-core panels, steel suspension grids, and floor-mounted aluminium plates, delivered in four phases over 1.5 years. Every surface had to integrate with existing HVAC, lighting, and office layouts while delivering the sculptural, undulating aesthetic Snøhetta envisioned.
PET felt bonded to aluminium is fragile; a scratch or dent anywhere in production, crating, or transport shows in the finished surface. That meant bespoke crating and handling procedures at every stage from factory to site. I led NOWN's design and engineering department through the full scope, from parametric scripting of the undulating forms through hardware sourcing, risk assessment, phased material procurement, and close coordination with Snøhetta's design team. Our team handled the majority of design execution from concept through installation.
The four phases went in with minimal rework. The client returned with further scope, and the factory mock-up has since become a NOWN staple reference project when architects and clients come to visit.






