Christopher Nolop
A-308Selected works, eight of eight

Wates
Fit Out

Location
10 Gresham Street, London EC2V
Building
Foster + Partners
Fit-out design
Perkins&Will
Contractor
Wates
Installer
Preferred Contracts Ltd
Employer
NOWN
Role
Head of Design & Engineering
System
Knitted textile wall panels on steel frames, 700+ panels, four floors; perforated aluminium ceiling system
Size
About 800 sq m of system
Status
Completed 2026
Knitted wall panels in navy running the length of the banquette at 10 Gresham Street
1/A-308Knitted wall, colour set navy
01Brief

NOWN delivered a custom interior wall system and a perforated aluminium ceiling system for a new European headquarters at 10 Gresham Street in the City of London, a 145,000 sq ft Foster + Partners building, with the tenant fit-out designed by Perkins&Will. The knitted wall panels had to reach a minimum NRC acoustic rating of 0.9.

02Work

More than 700 machine-knitted fabric panels were stretched across steel frameworks, delivered in four colour sets with matched RAL-coated trim, spanning four floors on a phased programme. Each panel is custom-sized and programmed on industrial knitting machines; the textile surface has the grain and weight of an architectural finish rather than a soft goods treatment. The steel frames demanded extremely tight tolerances, and locking them in required iterative press brake testing across several steel alloys to dial in bend radii and springback before final production parameters were set. I led NOWN's design team through frame development, alloy selection, press brake iteration, panel sizing, colour coordination, trim specification, and phased delivery logistics. The supply chain ran from international yarn suppliers into a constrained City of London site, which required close coordination on material flow, installer sequencing, and live resolution of field conditions as each phase progressed.

03Result

Installation ran in phases through 2026. Each completed floor carried the colour progression another step across the building.

700+
knitted panels
4
colour sets, 4 floors
0.1mm
the maintained tolerance in metal folding of panel frames
The reception desk under the perforated ceiling, timber-lined walls and glazing beyond
2/A-308Lobby, perforated ceiling
Meeting room lined in green knitted panels
3/A-308Meeting room, colour set green
4/A-308 Typical product details, 1:101 Panel end condition02 Panel corner condition 203 Panel end condition04 Trim assembly05 Panel seam condition06 Top and bottom condition07 Panel corner condition 1NOWN install drawing, level 5, January 2026
Typical product details, 1:1
5/A-308 Level 5 elevations and room plans1 Meeting room plan, 1:502 Room plan, 1:503 Panel layout, walls 05-62A and B4 Panel layout, walls 05-58A and BNOWN record set, level 5, January 2026
Level 5 elevations and room plans
Fabric panels being handled on the production floor
6/A-308Production floor, fabric handling
Wrapped and crated panels ready for shipping
7/A-308Crated panels, ready to ship